PART 3 EXECUTION
3.1 FIELD MEASUREMENTS
- Contractor shall field verify all dimensions prior to fabrication of cover.
3.2 DELIVERY, STORAGE AND HANDLING
- Contractor shall be responsible for unloading, storing and handling cover.
3.3 INSTALLATION
- Contractor shall be responsible for installing the cover per manufacturer’s directions. Only competent workmen familiar with this type of erection shall be used. The cover shall be erected level and plumb, and to be true within the specified construction tolerances; no cumulative dimensional error is allowed.
- Prior to installation, the erector shall check all design dimensions as shown on drawings. Any discrepancies between the field dimensions and design dimensions shall be brought to the attention of RPS Engineering. No installation shall proceed until site conditions are remedied to the point that the cover will be installed correctly. Any remedies are not the responsibility of the cover manufacturer.
- The erector shall furnish all equipment to install the cover in place. All bolted and anchored connections for the cover shall be made by means of bolting material specified and as noted on the drawings.
- The cover shall not be modified in any manner without first consulting RPS Engineering.
* * * END OF SECTION * * * |
|